Holy Shrines

90% of Elhujjeh Basement Project achieved

The Maintenance Department of Imam Hussain Shrine has stated that 90% of the wall and floor covering works of Elhujjeh Basement project have been achieved, and the basement will be open during the Nights of Quran Revelation, Laylat al-Qadr, to receive pilgrims. 

 

The Maintenance Department of Imam Hussain Shrine has stated that 90% of the wall and floor covering works of Elhujjeh Basement project have been achieved, and the basement will be open during the Nights of Quran Revelation, Laylat al-Qadr, to receive pilgrims. 

Kereem Elembari – Maintenance Department Director – said, “The walls are being covered with alabaster and the floor with marble. And such a project, which is 85 meters long and 9 meters wide, will hold a great number of visitors.”

Elembari also said that the basement is fully equipped with the best high-tech air-conditioning system, fire-extinguishing system, and alert system in order to make the most convenient atmosphere possible for the visitors.

 

 

Related Articles

Back to top button